- properties
- audio = soundMAX HD audio 1
- configure
- enable
- pin line = stereo mix
Thursday, 22 November 2007
22nd nov
a quick note on applying sound to windows encoder.
Monday, 19 November 2007
19th nov
Just some notes on what i must do for 4.3
half of the work is learning more about my target audience. so questionaires, interviews, focus groups etc will tell me more and prove there IS a target audience.
The second half is to practice techniques i will use in my product. i have never used quick camera cuts with sudden stop/start music (MTV style) so i will do this. i have never over dubbed my voice to narrate, so i will do this. finally, i have never screen captured. so i will do this.
they only need to be basic, but i just need to demonstrate i have practised this.
half of the work is learning more about my target audience. so questionaires, interviews, focus groups etc will tell me more and prove there IS a target audience.
The second half is to practice techniques i will use in my product. i have never used quick camera cuts with sudden stop/start music (MTV style) so i will do this. i have never over dubbed my voice to narrate, so i will do this. finally, i have never screen captured. so i will do this.
they only need to be basic, but i just need to demonstrate i have practised this.
Monday, 5 November 2007
5th Nov
I had done work on 4.2 however, it wasnt detailed enough, and so was infact suitable for 4.1 - i will now need to make it detailed and a "certain" approach in order to have it classed as 4.2
I also need to make my own schedule for unit 4. the dead line for it is november 30th, so i need to fit in times when all of it will be finished.
I am also ready to pitch my idea, which is part of unit 4, and i will do the pitching on the 8th of this month.
I have also been told that my AS re-sit is due at the end of may. so i will need to plan out when i will do each piece of work.
Also - useful site;
http://en.wikipedia.org/wiki/Myspace
I also need to make my own schedule for unit 4. the dead line for it is november 30th, so i need to fit in times when all of it will be finished.
I am also ready to pitch my idea, which is part of unit 4, and i will do the pitching on the 8th of this month.
I have also been told that my AS re-sit is due at the end of may. so i will need to plan out when i will do each piece of work.
Also - useful site;
http://en.wikipedia.org/wiki/Myspace
Subscribe to:
Comments (Atom)
